Elite Accuracy,
Ultimate Optimization.
The next generation
of tie delivery is here
The Automated Tie Unloader (ATU) is designed to streamline the unloading and distribution of crossties along the railroad right-of-way. By automating a traditionally labor-intensive process, the ATU improves safety, increases efficiency, and helps railroads complete tie programs faster within limited work windows.
Built with Herzog’s focus on innovation and reliability, the ATU integrates seamlessly into material handling operations and supports both new construction and maintenance-of-way projects. The system allows crews to unload ties in a controlled, consistent manner as the work train moves through the project area, reducing delays and improving workflow for tie installation teams.
Commuter railroads
Short line railroads
Tap into a revolutionary tie unloading system
Railroads move large volumes of ties to job sites every year, and traditional unloading methods often require significant manual labor and extended track time. The Automated Tie Unloader was developed to provide a safer and more efficient solution for handling and distributing ties during rail construction and maintenance operations.
The ATU and Herzog Survey Platform work hand-in-hand to ensure safety on the railroads. The Herzog Survey Platform boasts new tie inspection capabilities that communicate with the ATU’s GPS capabilities to deliver new ties exactly where they’re needed.
Automated Tie Unloader Features
-
Enhanced Safety Automation reduces manual lifting and limits personnel exposure to moving equipment and heavy materials.
-
Improved workflow The ATU’s eight-car consist ensure ties are delivered where crews need them, reducing delays and increasing installation efficiency.
-
Integrated with tie programs Designed to support high-production tie gangs and track rehabilitation projects.
-
Automated tie unloading Efficiently removes ties from railcars and distributes them along the right-of-way with controlled, consistent placement.
-
Reduced labor requirements Automation significantly reduces the number of personnel required to unload and manage ties along the right-of-way.
-
Reliable performance Engineered by Herzog to meet the demands of modern railroad maintenance and construction operations.