Lifted Logic Web Design in Kansas City clock location phone play check_box_outline_blank check_box chevron-down chevron-left chevron-right chevron-up facebook instagram linkedin google plus pinterest radio_button_checked radio_button_unchecked x arrow-up send globe marker close controls Spotify applepodcasts

Asphalt Look Ahead

Herzog’s Heavy/Highway division is underway for the 2023 asphalt paving season.

 

Coming off of a slightly down year after setting two back-to-back annual volume records, the division has the largest backlog ever and is excited to get back on track. Most of the volume for 2023 is with the Missouri Department of Transportation (MoDOT) and includes over $60 million in work covering 379 miles of rural highways and 14 miles of interstate. Also on the books are two Kansas Department of Transportation (KDOT) projects amounting to roughly $9 million in work and covering 13 miles of both primary and secondary highways. In addition to MoDOT and KDOT work are over 25 municipal, bridge, and commercial projects amounting to roughly $10 million in work.

 

2023 MAJOR ASPHALT WORK

KDOT K120 Brown County
MoDOT Route N, ZZ, EE, C, KK, D, B Gentry, Harrison, Nodaway Counties
MoDOT Route P, K, V, 145, A Daviess, Grundy, Mercer, Harrison Counties
MoDOT Routes 46, 136 Nodaway, Gentry Counties
MoDOT Route FF, J, U, Y, NN Gentry, Worth, Harrison Counties
MoDOT Route T, BB, H, HH, DD, EE, CC, Z, KK, PP, M Atchison, Holt, Nodaway, Andrew, Gentry Counties
MoDOT Route F, MM, T, M, U, JJ, D, C, NN, C, B Harrison, Daviess, Mercer, Grundy Counties
KDOT US 36 Doniphan County
MoDOT Route I-29 Andrew, Buchanan Counties
City of St. Joseph, MO 2023 Resurfacing